BASKET   0
Items in Cart: 0 Subtotal: $0.00 Checkout View Cart
Spring Savings Sale 20% off sitewide through April 30th
Spring Savings Sale 20% off sitewide through April 30th

Dura Grip II™ BOCA Aluminum Side Rail for 36" Width Fiberglass 4 Step

Item # 575221

$159.99

IN STOCK & Ships 4-5 Business Days
Add to Cart Button.
Questions? We are here to help!

Contact us for advice or more details. Our mobile home and RV parts specialists are here to help you and answer your questions.

Bright aluminum heavy duty constructed to BOCA specifications. Extra wide handrail with specially designed grip to ensure safety and durability. Protective plastic rail end cap to prevent siding damage. 10 Year Prorated Manufacturers Warranty - Made in the USA.

Specifically designed to match with Dura Grip II™ 28" x 24" x 36" and 32" x 24" x 36" fiberglass 4 step. Pre-drilled for easy installation, mounting hardware included.

Disclosure: Rail specifications may not meet your local and state building code. You may need to check with your local building inspector.

This item ships via: UPS Freight Delivery Truck LTL Freight

Our Goal is to deliver your purchase in the quickest and most economical way possible. Shipping service and costs are determined by product, weight, package size and ship to destination.

Shipping Rates

To view shipping rates prior to checkout, add the product(s) to the shopping cart. On the My Cart page, click "calculate shipping rates", when the popup appears, enter your state and zip code and click update. The services available for the entire order will appear with the actual cost.

Estimated Arrival Date

  • USPS: 3-7 business days after ship date
  • UPS Ground: 3-7 business days after ship date
  • UPS 3 Day Select: 3 business days after the ship date. Example: If your order is shipped on Monday, your package will arrive on Thursday.
  • UPS 2nd Day Air: 2 business days after the ship date. Example: If your order is shipped on Monday, your package will arrive on Wednesday.
  • UPS Next Day Air: The next business day after the ship date.
  • LTL Freight: 5-7 business days after the ship date.

Order Tracking: In most cases you will receive shipment notification via email. You can also track your order online. For assistance contact us.

Reviews Summary
Avg. Customer Rating: 5 stars 5 stars 5 Stars (based on 6 Reviews)

Already purchased this product? Write a review

Railing
5 out of 5
The railing looks great and matched up with the steps perfectly
great hand rail
5 out of 5
The welds look a bit poor quality, but not everyone is a great welder. But aside from that these hand rails are perfect for the steps I ordered. Well worth the money.
Great stuff
5 out of 5
Was easy to install and is sturdy Fits perfect on stairs that were ordered on a different order
Well made and decorative
5 out of 5
We bought this railing to go with our new 4 step stairs. My wife loves the classy look. It installed easily and was delivered on time as promised
Easy to Install
5 out of 5
This handrail is attractive, functional, and was a breeze to attach to my new steps.
The Best Price
5 out of 5
The steps are great,they were easy to install and have a rough surface this should eliminate my winter problem of the wooden steps being slippery.The company was great to work with.
View all 74 reviews
Q: Can hand rail be mounted on either side of steps?
A: Yes.

Bright aluminum heavy duty constructed to BOCA specifications. Extra wide handrail with specially designed grip to ensure safety and durability. Protective plastic rail end cap to prevent siding damage. 10 Year Prorated Manufacturers Warranty - Made in the USA.

Specifically designed to match with Dura Grip II™ 28" x 24" x 36" and 32" x 24" x 36" fiberglass 4 step. Pre-drilled for easy installation, mounting hardware included.

Disclosure: Rail specifications may not meet your local and state building code. You may need to check with your local building inspector.

This item ships via: UPS Freight Delivery Truck LTL Freight

Our Goal is to deliver your purchase in the quickest and most economical way possible. Shipping service and costs are determined by product, weight, package size and ship to destination.

Shipping Rates

To view shipping rates prior to checkout, add the product(s) to the shopping cart. On the My Cart page, click "calculate shipping rates", when the popup appears, enter your state and zip code and click update. The services available for the entire order will appear with the actual cost.

Estimated Arrival Date

  • USPS: 3-7 business days after ship date
  • UPS Ground: 3-7 business days after ship date
  • UPS 3 Day Select: 3 business days after the ship date. Example: If your order is shipped on Monday, your package will arrive on Thursday.
  • UPS 2nd Day Air: 2 business days after the ship date. Example: If your order is shipped on Monday, your package will arrive on Wednesday.
  • UPS Next Day Air: The next business day after the ship date.
  • LTL Freight: 5-7 business days after the ship date.

Order Tracking: In most cases you will receive shipment notification via email. You can also track your order online. For assistance contact us.

Q: Can hand rail be mounted on either side of steps?
A: Yes.
Shopper Approved Click Here For More Reviews.

"Very fast delivery of the part that I needed. Very pleased and will definitely order from Mobile Home Parts Store for all my replacement parts."

-Gladys J shopper approved star 1 shopper approved star 2 shopper approved star 3 shopper approved star 4 shopper approved star 5

"Couldn't believe I got the order so fast. Thank you for the wonderful customer service. I wish all companies would offer the service you do."

-Valerie L